Proposition 2: Expense from the Reserve Fund - 2024

In addition to voting on the 2025-26 annual operating budget, residents will have the opportunity to vote on a separate proposition for improvement projects at North Middle School. The proposed projects include the installation of a synthetic playing field surface and site improvements at the track/athletic field on Arrandale Avenue, as well as the renovation of a former shop classroom into a multi-purpose meeting room in North Middle.

The funding for these projects is currently available in the district’s Capital Reserve Fund. By law, monies can only be expended from this fund with voter approval. If approved, these projects would be completed at no cost to taxpayers and without any impact on the tax levy. See below for more details.

Architectural drawing of proposed track upgrades at North Middle School

PROJECT OVERVIEW

 Phase I: Installation of a synthetic playing field surface with storm drainage improvements at North Middle School
This includes several site improvements, including:

  • Resurfacing of the running track and installation of new areas for track and field events
  • Installation of a new “home” grandstand with press box
  • Full renovation of public restrooms with connection to sewer system
  • Construction of a storage building with an adjoining concession stand
  • Addition of new pedestrian walkways for access from both sides of the venue
  • Installation of a dark-sky compliant playing field lighting system
     

Full Renovation of Room 21 at North Middle School
This project would convert a former shop classroom into a multi-purpose meeting room. The space is no longer needed as a shop classroom following the addition of new STEM labs at North Middle last summer. An overview of the work includes:

  • New flooring, ceiling, and lighting
  • New unit ventilator system (HVAC) with heating and cooling capabilities
  • New emergency exterior egress door (necessary for place of assembly)
  • New furnishings, plus instructional technology and AV equipment

ESTIMATED TOTAL: $8,868,019

 

Q & A

Q: How would the project be funded?
Through utilization of existing funds in the Capital Reserve Fund, at no additional cost to taxpayers. Approval of the proposition does not increase the tax levy.


Q: What is the breakdown of the estimated total cost of $8,868,019?
All of the proposed athletic field improvements total $8,459,019 and the full renovation of North Middle Room 21 totals $409,000. The project will generate approximately $886,800 in building aid (10%) once completed, which the district will receive from New York State over a 15-year period.


Q: Why is the field improvement project being called Phase I?
If voters approve this project for 2025–26, it is anticipated that the administration would present the Board of Education with a recommendation for 2026–27 to authorize a proposition asking the voters to allow utilization of the capital reserve to fund a Phase II project for similar improvements at the South High/Middle School campus, pending the availability of sufficient funds in the reserve.


Q: Could South High/South Middle athletes utilize the new North field on occasion until there are field improvements on the South campus?
Yes, subject only to potential scheduling conflicts.


BALLOT LANGUAGE

Proposition #2: Expense from the Capital Reserve Fund - 2024

This proposition is to utilize funds from our Capital Reserve which has no financial impact on the voter. Shall the Board of Education of the Great Neck Union Free School District be authorized to expend a sum not to exceed $8,868,019 from the Capital Reserve Fund 2024 as established on May 21, 2024 for the purpose of performing the following capital improvements: athletic field renovations, reconstruction and upgrades including installation of a synthetic playing field surface with drainage and site improvements including resurfacing of the running track, installation of new track and field events, installation of a new “home” grandstand with press box, renovation of restrooms with connection to sewer system, construction of storage building with concession stand, addition of new pedestrian walkways, installation of dark sky compliant playing field lighting system; classroom renovation and conversion to multi-purpose meeting room including flooring, ceiling and lighting replacements and upgrades, installation of new unit ventilator system, installation of exterior door and hardware, furnishings, instructional technology upgrades and audio visual equipment at the North Middle School including all labor, materials, equipment, apparatus and incidental cost related thereto? Since the funds to be expended hereunder are from the Capital Reserve Fund, approval of this Proposition will not require a tax levy upon the real property of the School District.
 


 

Section 203 of the federal Voting Rights Act requires school districts in Nassau County to provide election information in English and Spanish. In accordance with this Act, materials produced by the Great Neck Public Schools pertaining to the District Election and School Budget Vote will be distributed in both languages.


 

Propuesta 2: Gasto del Fondo de Reserva de Capital - 2024

Además del presupuesto operativo anual, los residentes tendrán la oportunidad de votar sobre una propuesta separada para proyectos de mejora en North Middle School. Los proyectos propuestos incluyen la instalación de una superficie de campo de juego sintética y mejoras en el sitio en la pista/campo deportivo en Arrandale Avenue, así como la renovación de un antiguo aula de taller para convertirla en una sala de reuniones de usos múltiples en North Middle.

Los fondos para estos proyectos están actualmente disponibles en el Fondo de Reserva de Capital del distrito. Por ley, el dinero de este fondo sólo se puede gastar con la aprobación de los votantes. Si se aprueban, estos proyectos se completarían sin costo para los contribuyentes y sin ningún impacto en la recaudación impositiva.

Architectural drawing of proposed track upgrades at North Middle School

DESCRIPTION GENERAL DEL PROYECTO 

Fase I: Instalación de una superficie de campo de juego de césped sintético con mejoras en el drenaje pluvial en North Middle School, así como varias otras mejoras en el sitio, que incluyen:

  • Repavimentación de la pista de atletismo e instalación de nuevas áreas para eventos de pista y campo
  • Instalación de una nueva tribuna “local” con palco de prensa
  • Renovación completa de los baños públicos, así como la conexión al sistema de alcantarillado
  • Construcción de un edificio de almacenamiento con un puesto de concesión contiguo
  • Adición de nuevas pasarelas peatonales para el acceso desde ambos lados del recinto
  • Instalación de un sistema de iluminación del campo de juego compatible con el cielo oscuro

 

Renovación completa del aula 21 de North Middle School
Convertir una antigua aula de taller en una sala de reuniones de usos múltiples. Este espacio ya no es necesario como aula de taller después de la adición de laboratorios STEM en North Middle el verano pasado.

  • Nuevos pisos, techos e iluminación
  • Nuevo sistema de ventilación unitaria (HVAC) con capacidad de calefacción y refrigeración
  • Nueva puerta de salida de emergencia al exterior (necesaria para el lugar de reunión)
  • Nuevo mobiliario, así como tecnología educativa y equipos audiovisuales
     

TOTAL ESTIMADO: $8,868,019

PREGUNTAS Y RESPUESTAS

P: ¿Cómo se financiaría el proyecto?
A través de la utilización de los fondos existentes en la reserva de capital, sin costo adicional para los contribuyentes. La aprobación de la propuesta no aumenta el gravamen fiscal.


P: ¿Cuál es el desglose del costo total estimado de $8,868,019?
$8,459,019 para todas las mejoras propuestas en el campo deportivo. $409,000 para la renovación completa del aula 21 de NMS, incluidos el mobiliario, la tecnología de la información (IT) y el equipo audiovisual. El proyecto generará aproximadamente $886,800 en ayuda a la construcción (10%) una vez completado, pagadero durante un período de 15 años.


P: ¿Por qué el proyecto de mejora del campo se llama Fase I?
Si los votantes aprueban este proyecto para 2025–26, se anticipa que la administración presentará a la Junta de Educación una recomendación para 2026–27 para autorizar una propuesta que les pida a los votantes que permitan la utilización de la reserva de capital para financiar un proyecto de Fase II para llevar a cabo mejoras similares en el campus de South High School/South Middle School, a la espera de que se disponga de fondos suficientes en la reserva.


P: ¿Podrían los atletas de South High/South Middle utilizar el nuevo campo North de vez en cuando hasta que haya mejoras en el campus South?
Sí, sujeto solo a posibles conflictos de programación.

La Sección 203 de la Ley Federal de Derechos de Votación requiere que los distritos escolares en el Condado de Nassau proporcionen información sobre las elecciones en inglés y español. De acuerdo con esta Ley, los materiales producidos por las Escuelas Públicas de Great Neck que forman parte del la Elección del Distrito 2025–26 y la Votación del Presupuesto Escolar se distribuirán en ambos idiomas.